top of page

The College of Wooster

Andrews Hall

Andrews Hall is the final residence hall in a three-year, consecutive building renovation. Stevenson Hall and Armington Hall were completed in 2018 and 2019, respectively. The 24,000-square-foot building consist of completing demolishing the existing interior on all four levels and constructing new single and double residence rooms with each level featuring a small, common space. The main level will contain a large, common collaboration space--complete with a convenience kitchen for occupants. The building will be fully ADA accessible and will include a new four-stop elevator.

bottom of page