design-build
… Fast, Efficient & Cost Effective
Design-Build allows for budget and schedule control much earlier in the project process than other methods of construction.
The close working relationship between design-build team members during the all-important pre-construction phase enhances everyone’s efficiency. Changes made during the design process can be carried out quickly and cost-effectively with the owner being comfortable that both design and constructability issues are being addressed.

With the architect and consulting engineers as part of the design-build team, communications are improved, decisions are made faster, and responsibilities are fixed.
The design-build team coordinates bidding and procurement procedures. Once the owner approves the final budget, construction can begin. The design-builder and its subcontractors then deliver a quality finished project within the established schedule.
If required, the work may proceed on a “fast track” basis with documents being developed while construction is in progress.
… some of Our experience
Bogner Construction Company has completed the following projects as Design-Build Contractors:

TechniGraphicS [4 projects; 2 in Fort Collins, CO and 2 in Wooster,OH ]![]()

Western Reserve Group;Wooster, OH![]()

Brethren Care Village; Ashland, OH![]()

Holmes Cheese Company; Millersburg, OH
![]()

Dix Communications; Kent, OH![]()

Ashland Grace Brethren Church; Ashland, OH
![]()

Alice Noble Ice Arena; Wooster, OH![]()

United Titanium, Inc. [5 projects]; Wooster, OH![]()

Wayne Savings Community Bank; Wooster, OH![]()

The Daily Record Printing Facility; Wooster, OH![]()

Gerstenslager Company Danley Press Pit; Wooster, OH